Tag Archive : infrastructure

IEME Brasil and LAEDE at NT-Expo – Forging the Future of Railways

The 23rd edition of NT-Expo – Forging the Future of Railways, held this year in the Anhembi District of São Paulo, began this Tuesday, the 22nd. Recognized as one of the main events in the sector in South America, the fair arrives at a time marked by the appreciation of the railway model, both for urban mobility and for freight transportation.

According to the National Association of Railway Transporters, ANTF, the sector received investments in the order of 14 billion reais in 2024 and expects an additional 54 billion reais in the next three years.

IEME Brasil and LAEDE, companies that have metro-rail engineering in their DNA, are present at NT-Expo (stand A061) to share the news and welcome customers, partners and friends.

Come visit us.

The 23rd NT-Expo will continue until Thursday, 24/04.

 

1
2
3
4
5
6
 
 
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

New equipment increases LAEDE’s competitiveness

LAEDE, a laboratory for static and dynamic mechanical testing of materials and structural components, which is part of IEME Brasil, begins 2025 strengthened by the modernization process of its facilities and the acquisition of new equipment. The laboratory now has a new hydraulic unit and a new controller for hydraulic actuators, which together increase the company’s efficiency and service capacity.

“The hydraulic unit increases the laboratory’s capacity to perform more simultaneous tests, offering a time saving in these services. With the new controller, the laboratory is now able to control more hydraulic actuators simultaneously, in addition to modernizing the precision of the tests”, explains Lucas Juliani, director of LAEDE. In addition, the new hydraulic unit is more modern from an environmental point of view, providing energy savings of around 30% for its operation.

The equipment particularly benefits the performance of material fatigue tests, which can be performed with greater quality, accuracy and speed. “With this equipment and the ongoing modernization of the laboratory, LAEDE, which has Inmetro accreditation, the only one in Brazil for various tests on metro-rail components, will double its capacity to perform tests, being able to serve its customers much more quickly,” says Marco Juliani, director of IEME.

 

20250226_IEME_LAEDE_investimentos_1
20250226_IEME_LAEDE_investimentos_2
20250226_IEME_LAEDE_investimentos_3
 
 
  • 20250226_IEME_LAEDE_investimentos_1
  • 20250226_IEME_LAEDE_investimentos_2
  • 20250226_IEME_LAEDE_investimentos_3

IEME Brazil: accreditation maintained

After two years as an Accredited Inspection Body (OIA), IEME Brazil has just undergone a supervisory assessment that resulted in a recommendation to maintain INMETRO Accreditation, which enables the company to certify engineering projects and works prepared by public works concessionaires. It is worth remembering that project inspection is a mandatory contractual requirement for public works concessionaires.

INMETRO Accreditation is one of the service fronts of IEME Brazil, a company with over 35 years of experience in the areas of Engineering Projects (metro-rail systems, bridges, dams, stadiums and structures in general), Urban Development (land regularization, urbanization of settlements, accessibility and social work) and Laboratory Tests (LAEDE) focused on metro-railways, civil structures and shock absorbing systems, elastomers, vibration, noise and construction materials.

 

Foto_Governo_do_Estado_de_SP_Gilberto Marques_Creative_Commons_Linkedin

Government of the State of São Paulo / Gilberto Marques / Creative Commons

SP-150_Jardim_Casqueiro_Governo_de_SP_Linkedin

Government of the State of São Paulo / Gilberto Marques / Creative Commons

 
 
  • Foto_Governo_do_Estado_de_SP_Gilberto Marques_Creative_Commons_Linkedin
  • SP-150_Jardim_Casqueiro_Governo_de_SP_Linkedin

More public investment, more private investment

On November 29, in Brasília, BNDES announced a financial contribution of R$10.65 billion for infrastructure projects in São Paulo. The resources, which are part of the New PAC (Growth Acceleration Program), will be allocated to expansion projects for the São Paulo subway, a road complex, a modern rail link between the city of São Paulo and Campinas (about 100 km away), and the purchase of 1,300 electric buses.

Infrastructure projects and projects, especially in the road and metro-rail areas, are the main activity of IEME Brasil, which has been working for over 35 years with instrumentation and monitoring of roads, data processing and analysis for engineering reports, various tests, and accredited inspection (by INMETRO) of road and rail projects and projects. In addition, it has LAEDE, a laboratory that has Cgcre accreditation (ABNT NBR ISO/IEC 17025) and is part of the Brazilian Network of Testing Laboratories (RBLE).

Due to investments in infrastructure, which are already reflecting an increase in demand, LAEDE recently acquired new equipment (hydraulic pumps and controllers) for testing metro-rail components and systems. The hydraulic pump, for example, is a state-of-the-art piece of equipment, capable of saving up to 20% of energy, and is the first of its kind to be installed in Brazil.

The investments ratify IEME’s commitment to the quality and safety of the projects and works in which it participates, remembering that the company is present on all São Paulo subway lines and in the structural tests of Rodoanel Norte, to name a few examples. The company also carries out a series of works focused on land regularization and social housing.