IEME and LAEDE played a key role in the execution of this engineering project, carried out by the construction company Álya. IEME was responsible for preparing all the track designs, including a complete study of the vibration attenuation system (mass-spring). LAEDE, in turn, was responsible for conducting the field and laboratory tests required for the permanent way’s approval.
