A visit to the Baixada Santista Light Rail System (VLT)
IEME and LAEDE played a key role in the execution of this engineering project, carried out by the construction company Álya. IEME was responsible for preparing all the track designs, including a complete study of the vibration attenuation system (mass-spring). LAEDE, in turn, was responsible for conducting the field and laboratory tests required for the permanent way’s approval.
Related Posts

A visit to the Baixada Santista Light Rail System (VLT) IEME prepared all the track designs, including a complete study of the vibration attenuation... 
IEME Brasil and LAEDE at NT-Expo – Forging the Future of Railways The 23rd edition of NT-Expo – Forging the Future of Railways, held this year in the Anhembi District of São Paulo, began this Tuesday, the... 
IEME monitors footbridges at the Santo Amaro Metro/CPTM station In March, pedestrian footbridges on the São Paulo subway were monitored by IEME Brasil with... 
New equipment increases LAEDE’s competitiveness LAEDE begins the year 2025 strengthened by the process of modernizing its facilities and the acquisition of new...
